How high are the penalties for failing to carry out a company energy audit in Poland, and how can they be avoided?

Carrying out a company energy audit is mandatory for many large companies operating in Poland, and failure to do so can result in significant financial consequences. The level of penalties for failing to carry out the audit is determined by the President of the Polish Energy Regulatory Office (URE) and can be substantial, adversely affecting a company’s financial stability. Find out how high these penalties can be and how to protect your business effectively by carrying out the audit in compliance with applicable Polish regulations.

Penalties for failing to carry out a company energy audit

Penalties imposed by the President of the Polish Energy Regulatory Office (URE) for failing to carry out the mandatory company energy audit can amount to up to 5% of the company’s annual turnover for the previous tax year. The amount depends on a number of factors, such as the scale of the company’s operations, the nature of the breach and any repeated failures to comply. The penalty is administrative in nature, and its amount is determined by URE after a detailed assessment of the individual case. In practice, this means that for large companies the sums can be very substantial, reaching hundreds of thousands or even millions of Polish zlotys, significantly affecting the company’s financial position and market reputation.

When is a company energy audit mandatory in Poland?

The obligation to carry out a company energy audit applies to all large companies that, in each of the last two financial years, employed an annual average of at least 250 people or recorded annual turnover exceeding EUR 50 million and a balance sheet total exceeding EUR 43 million. The audit must be carried out periodically, every four years. Every company meeting the above criteria is required to notify the President of the URE that the audit has been completed and to document its results. Failure to carry out the audit or carrying it out incorrectly is treated by URE as a breach of statutory obligations, which results in the financial penalties described above.

How to avoid a penalty for a missing company energy audit

The simplest and most effective way to avoid a financial penalty is to carry out the company energy audit on time and in compliance with Polish regulations. The audit should be carried out by a qualified specialist or a team of experts and documented in a detailed report covering all required aspects. It is worth remembering that the audit is not only about meeting formal requirements; it is also an excellent opportunity to identify areas of excessive energy consumption and implement solutions that deliver real savings. Conducting energy audits regularly helps maintain full regulatory compliance, eliminating the risk of financial sanctions while providing the company with measurable economic benefits.

Recommended Articles

Two maintenance engineers examine the piping and valves of an industrial installation in an operating production hall.

How to prepare an installation upgrade in an operating manufacturing plant

Upgrading installations in an operating plant means aligning the work schedule with production and safety requirements. This article explains how to identify critical loads, divide the work into phases and prepare both a cutover and rollback plan. It also covers the information designers and contractors

Read the article →

Solar panels on the roof of an industrial building and a transformer substation on the premises of a manufacturing facility.

Contracted capacity and solar PV – what changes when you have your own installation?

A solar PV system reduces electricity drawn from the grid during sunny hours, but it does not always reduce peak grid demand. Using an example, we show why contracted capacity must be assessed against 15-minute demand and PV generation profiles. We explain which data to

Read the article →

An engineer assesses a BESS battery storage installation with a PCS inverter next to an industrial production hall.

Battery storage for peak shaving – how to size power and capacity

Sizing a peak-shaving battery starts with setting a grid-import limit and examining successive demand peaks in a 15-minute load profile. The highest required reduction determines system power, while capacity depends on the energy needed to maintain that limit, including losses and a reserve. We show

Read the article →

Engineer inspecting an electrical installation in a production hall fitted with LED luminaires.

LED lighting retrofits and capacitive reactive energy: when do extra charges arise?

After an LED lighting retrofit, additional charges for capacitive reactive energy may appear, although LED technology alone does not mean they will occur. We explain how to distinguish the effect of LED drivers from overcompensation and how to compare P/Q profiles before and after replacing

Read the article →